Relative Weighting and Planning (Agile Planning Poker)

There's an excellent article expounding the benefits of relative planning at Scrum Shortcuts: Unlike traditional estimation units such as ‘ideal days’, the measurement unit utilized during relative estimation is not time based but rather, size based. Size in this case does not have a direct relationship to a
04 Oct 2012 1 min read
estimation

Estimating a Full Backlog Based on a Sample of It

A fine description of the difficulties of software estimation: 1. It’s important to remember that the relationship between points and hours is not an equivalence. It is not that 1 point equals 4 hours (which is what our example showed above). It is that 1 point equals a mean
01 Oct 2012 1 min read